Sunny Fields Staircase
We had been instructed by the client to undertake GA & Fabrication drawings to this internal stair & balustrade, for an extension to an existing property. The design had already been undertaken by the clients engineer. This included some curved elements at the top and bottom of the stair along with a curved internal handrail that would later be fixed to a internal wall after the stair was installed.
See MoreNorth Street Balustrades
We had been instructed by the client to undertake GA & Fabrication drawings to the balustrades around this new build. the design had already been undertaken by the clients engineer. This included around 60 Balustrades & Juliet Balconies around this 6 Sided New Build.
See MoreGreenhill Way
We had been instructed by the client to undertake GA & Fabrication drawings to this Stainless Steel Balustrade, for a new property. The Design had been approved by our client's engineer. This featured two 5-Storey Staircases with Identical designs using stainless steel Handrails & Posts with Glass Infills, along with Shop-Bought components to fix it all together.
See More34-35 Thames Street
We had been instructed by the client to undertake GA & Fabrication drawings to this steel building, for a new property. the connection design had already been undertaken by the clients engineer. This was a 3-Phased Project that included a 5-Storey Steel Frame.
See MoreBishops Stortford
We had been instructed by the client to undertake GA & Fabrication drawings to this steel tank, for an existing site. The connection design had already been undertaken by the client's engineer. This was a complex model with a lot of curved pieces but the final product looked amazing.
See MoreGreat Suffolk Street
We had been instructed by the client to undertake GA & Fabrication drawings to this steel building, for an extension to an existing property. the connection design had already been undertaken by the clients engineer. We had a tight deadline on this but managed to hit this time ahead of schedule. This was a 3 Story – 6 Phased Steelwork project that was to be completed within 6 Months.
See MoreFabricating the Future, Collectively
Please contact us today and see how we can help you get your projects completed, collectively.
